Resumen:
Under the current European market environment, transmission companies have to decide network expansion by maximizing social welfare. However, generation companies (GENCOs) decide their capacity expansion with the aim of maximizing their own profit. This process, in addition to the increasing penetration of renewable energy, storage and distributed generation, might represent a rupture between short and long-term signals. Therefore, this paper proposes a bi-level formulation for the generation and transmission coordination problem (GEPTEP). We consider a proactive framework in which a centralized TSO represents the upper level while the decentralized GENCOs, that trade in the market, represent the lower level. As a novel feature, an enhanced representative period framework is employed, which allows us to consider operation in both short and long-term storage technologies. A case study is presented to compare the results between perfect and imperfect competition in the market.
Palabras Clave: Proactive; Bi-level; Strategic; ransmission expansion; Generation expansion; Storage
Índice de impacto JCR y cuartil WoS: 3,895 - Q2 (2019); 7,900 - Q1 (2023)
Referencia DOI: https://doi.org/10.1016/j.esr.2019.02.006
Publicado en papel: Abril 2019.
Publicado on-line: Marzo 2019.
Cita:
I.C. González-Romero, S. Wogrin, T. Gómez, Proactive transmission expansion planning with storage considerations. Energy Strategy Reviews. Vol. 24, pp. 154 - 165, Abril 2019. [Online: Marzo 2019]